Surface preparation

The surface must be cleaned of dust and dirt, and completely dried. Depending on the surface material, the time before applying paint and varnish materials may vary. For example, concrete must dry for at least 28 days, cement plasters – 14, mineral thin-layer decorative plasters – 7, polymer putties – 3. Remember that gypsum putties and plasters can shrink, as a result of which the paint and varnish coating will crack after drying. Paint should be applied to the wallpaper after the glue has completely dried, not earlier than after 2 days. Wallpaper and glue for them have different compositions, so the properties of the paint may also change. For example, highly absorbent wallpaper will increase paint consumption and, accordingly, the time it takes to form the finish coat. To strengthen the base surface, improve adhesion and reduce paint consumption, use a primer recommended by the manufacturer. When applying paint and varnish materials to complex composite or previously painted surfaces, we recommend doing a test painting.

Color selection and application features

Choose a color according to the paint manufacturer’s fan. For tinting AkzoNobel products (Dulux, Marshall, Pinotex, Hammerite), use Acomix colorants. Colorants from other manufacturers may not give the desired result. Color perception is especially strongly influenced by: • The type of paint and varnish material. For example, the same black color looks different for paint, impregnation and varnish. • The degree of gloss. The color of a glossy surface looks more saturated compared to a matte one when choosing the same shade. • Features and relief of the surface. • The spectrum of the light source in the room. Warm light (like in incandescent lamps) will add yellowness to the selected shade, cold light (like in fluorescent lamps) adds blue. • The size of the room: the larger it is, the more intense the color seems. A small color sample in a fan/catalog may look different in a large volume. To be sure of the selected color, we recommend doing a test painting of a small area of ​​the surface.

Important Note: “Choose the best painting company in Nashua, NH, for high-quality residential and commercial painting services. Get a free estimate from professional painters today! Contact us now.”

When painting large areas, mix several cans in one container. It is necessary to paint in whole elements using the “corner to corner” technology. This will allow you to get a uniformly painted surface. Be sure to thoroughly mix the paint and varnish material before application for optimal viscosity and color homogeneity. Different types of paint and varnish materials are applied differently because they differ in composition. The thickness and number of layers should not exceed the recommendations for a specific product. Be sure to follow the “wet edge” rule: each subsequent strip should overlap the previous one along the wet edge of the paint. The next layer of paint and varnish material is applied only after the previous one has completely dried. This will avoid uneven coating on the surface. Optimal conditions for painting: air temperature +18…+22°C, relative humidity 50%. At low temperatures, the drying time increases, and dry air, on the contrary, accelerates the drying of paint and varnish materials. Choose only high-quality tools: pay attention to the quality of the brush pile and the roller coat. Clean and dry the tool thoroughly after use. When painting large rooms with a lot of light, it is better to use a spray gun. Paints of intense and bright shades from the red, yellow and orange range have limited hiding power. This is due to the fact that organic pigments are used in bright colors. For the first layer, mix a colorless base tinted in one of these colors with a white base of the same paint in a 1:1 ratio. For the next layer, you do not need to add a white base. 

Formation of the coating

The room should be well ventilated. The surface layer of paint and varnish materials dries quickly enough, but it is not yet a fully formed coating. It usually takes from several days to several weeks for the film to fully form on the surface. This depends on the type of paint and varnish materials, the thickness of the layer, temperature and humidity.

Important Note: “Looking for top-notch painting services in Manchester, NH? Our expert painters offer quality residential and commercial painting. Get your free estimate today! Contact us now.”

The quality of our products is ensured by the company’s quality system in accordance with the international standard ISO 9001:2015. We produce paint and varnish materials and cannot control the conditions of use of our products, compliance with the application technology and other factors that affect the formation of the finishing coating.


0 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

New Report

Close